18TH RD (17.0-A.7) over MISSION CREEK

7.0W OF SUMMERFIELD · County 117, Kansas · Built 1973 · 2 Lanes · 80 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000580911003008
Year Built
1973
Length
43.1 m (141.4 ft)
Max Span
17 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
80
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.