NAVAJO RD.11.3-O.0 over SCHELL CREEK
2.0N 4.3E OF SCHROYER · County 117, Kansas · Built 1930 · 2 Lanes · 10 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
39.798261, -96.595294
This bridge is in worse condition than 71.7% of bridges in County 117. The average bridge in Kansas is 0 years old; this one is 96 years old.
Nearby Bridges
12TH RD. 11.0-N.2 over SCHELL CREEK
Built 2019
11TH TERR.10.5-M.4 over SPRING CREEK
Built 2000
13TH RD. RS 1239 over SPRING CREEK
Built 2004
LIMESTONE_11.3-L.7 over LILY CREEK
Built 1994
13TH RD. RS 1239 over TRIB. TO SPRING CREEK
Built 1932
PHEASANT (RS 434) over ELM CREEK
Built 2023
LIMESTONE_12.1-L.7 over TRIB. SPRING CREEK
Built 1930
13TH RD (12.0-Q.1) over ELM CREEK
Built 1986
13TH RD. RS 1239 over TRIB. TO SPRING CREEK
Built 1937
LIMESTONE_13.0-M.0 over SPRING CREEK
Built 2004
Bridge Details
- Structure #
- 000580899303280
- Year Built
- 1930
- Reconstructed
- 1970
- Length
- 10.7 m (35.1 ft)
- Max Span
- 10.1 m
- Width
- 4.9 m (16.1 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $195,000
- Total Project Cost
- $300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.