SE 120 S. T.6-19.0 over RED CREEK
1.0N 1.4W OF RAGO · County 095, Kansas · Built 1970 · 2 Lanes · 10 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
37.472025, -98.106611
This bridge is in worse condition than 78.5% of bridges in County 095. The average bridge in Kansas is 0 years old; this one is 56 years old.
Nearby Bridges
SE 120 S. U.3-19.0 over NEGRO CREEK
Built 1981
SE 10 A. U.0-19.7 over RED CREEK
Built 1955
K42 HWY over RED CREEK
Built 2013
S.BERRY A T.0-18.0 over RED CREEK
Built 2002
K14 HWY over ROSE BUD CREEK
Built 1922
SE 120 S. V.1-19.0 over ROSE BUD CREEK
Built 1960
SE 110 S. U.8-18.0 over ROSE BUD CREEK
Built 1945
K42 HWY over ROSE BUD CREEK
Built 2013
K14 HWY over ROSE BUD CREEK
Built 1927
K42 HWY over CHIKASKIA RIVER DRAINAGE
Built 1957
Bridge Details
- Structure #
- 000480735606480
- Year Built
- 1970
- Length
- 17.8 m (58.4 ft)
- Max Span
- 5.8 m
- Width
- 7.9 m (25.9 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $230,000
- Total Project Cost
- $330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.