S Harvest Hill Rd over GYPSUM CREEK

7.5S 9.5E OF NEWTON · County 079, Kansas · Built 1975 · 2 Lanes · 25 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000400839105840
Year Built
1975
Length
27.9 m (91.5 ft)
Max Span
9.1 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
25
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.