Road 8 over S. BRANCH ELK RIVER

2.3N 7.0W OF HOWARD · County 049, Kansas · Built 2024 · 2 Lanes · 20 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

37.509167, -96.398447

This bridge is in worse condition than 26.5% of bridges in County 049. The average bridge in Kansas is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
000250921006428
Year Built
2024
Length
31.2 m (102.4 ft)
Max Span
12.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
20
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.