28TH. RD. over TRIB. TO COAL CREEK

28.0-A.6 · County 031, Kansas · Built 1993 · 2 Lanes · 20 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000160969605160
Year Built
1993
Length
6.3 m (20.7 ft)
Max Span
3 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
20
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.