W Coalfield over TRIB. TO CHERRY CREEK

1.0S 0.4E OF WEST MINERAL · County 021, Kansas · Built 2022 · 2 Lanes · 25 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000111083406760
Year Built
2022
Length
10.3 m (33.8 ft)
Max Span
2.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
25
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.