TTP RTE 0977 over TRIB. TO SOLDIER CREEK
10.0 W 3.1 S OF HOLTON · County 085, Kansas · Built 1935 · 2 Lanes · 35 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
39.419806, -95.924944
This bridge is in worse condition than 94.7% of bridges in County 085. The average bridge in Kansas is 0 years old; this one is 91 years old.
Nearby Bridges
MINOR 214 F1 over SOLDIER CREEK
Built 1955
MINOR 214 E2 over TRIB. TO SOLDIER CREEK
Built 1983
LOCAL 222 D6 over TRIB. TO SOLDIER CREEK
Built 1986
IRR BIA RTE 910 over BIG SOLDIER CREEK
Built 1987
K-16 HIGHWAY over SOLDIER CREEK
Built 2002
LOCAL F1 234 over TRIB. TO SOLDIER CREEK
Built 1975
LOCAL 222 J4 over BANNER CREEK
Built 1975
LOCAL 238 E7 over SOLDIER CREEK
Built 1993
LOCAL 206 B7 over BIG CROSS CREEK
Built 1955
IRR BIA RTE 909 over CROW CREEK
Built 1976
Bridge Details
- Structure #
- 0000B04862T0205
- Year Built
- 1935
- Reconstructed
- 1975
- Length
- 16.6 m (54.5 ft)
- Max Span
- 10.3 m
- Width
- 5.5 m (18 ft)
- Lanes
- 2
- Daily Traffic
- 35
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $550,000
- Total Project Cost
- $760,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.