NW 60th over GILLION CREEK

1.8E 2.0S OF POTWIN · County 015, Kansas · Built 1917 · 1 Lanes · 50 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000080857805880
Year Built
1917
Length
10.2 m (33.5 ft)
Max Span
9.1 m
Width
5.5 m (18 ft)
Lanes
1
Daily Traffic
50
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$180,000
Total Project Cost
$370,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.