NW 80th Street over DIAMOND CREEK

0.3W OF POTWIN · County 015, Kansas · Built 1931 · 2 Lanes · 65 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000080853705840
Year Built
1931
Length
21.3 m (69.9 ft)
Max Span
9.3 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
65
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.