Reno Rd RS 815 over DRY CREEK

1.8S 2.2E OF NEODESHA · County 205, Kansas · Built 1975 · 2 Lanes · 120 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000001030370
Year Built
1975
Length
31.2 m (102.4 ft)
Max Span
18.2 m
Width
6.9 m (22.6 ft)
Lanes
2
Daily Traffic
120
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$530,000
Total Project Cost
$640,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.