SUNRISE RD. over CLEAR CREEK

1.4N 0.3E OF MARION · County 115, Kansas · Built 1968 · 2 Lanes · 145 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000570760
Year Built
1968
Length
64.6 m (211.9 ft)
Max Span
22.5 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
145
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.