RS 412 F.5-18.5 over NEOSHO RIVER

0.5E 2.5S OF AMERICUS · County 111, Kansas · Built 1963 · 2 Lanes · 2,599 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000560110
Year Built
1963
Reconstructed
1991
Length
84.6 m (277.6 ft)
Max Span
32 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,599
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.