RS 300 SE 90 AVE over BAEHR CREEK

1.5N OF BLUFF CITY · County 077, Kansas · Built 1961 · 2 Lanes · 220 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000390150
Year Built
1961
Length
42.4 m (139.1 ft)
Max Span
15.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
220
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$177,000
Total Project Cost
$266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.