Limestone over WEST HUTCHIN CREEK

0.5N 4.1E OF HOWARD · County 049, Kansas · Built 1940 · 2 Lanes · 200 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000000250260
Year Built
1940
Length
7.7 m (25.3 ft)
Max Span
2.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.