RS 2 over RELIEF OF NEOSHO RIVER

0.2W OF HUMBOLDT · County 001, Kansas · Built 2000 · 2 Lanes · 1,098 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000010060
Year Built
2000
Length
78.3 m (256.9 ft)
Max Span
14 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,098
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.