IA 2 over OVERFLOW

1.6 MI. W. OF I-29 · County 071, Iowa · Built 2022 · 4 Lanes · 8,000 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000000000701160
Year Built
2022
Length
12.1 m (39.7 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
8,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.