US 20 over MAPLE RIVER OVERFLOW

4.0 mi. E of E jct. US 59 · County 093, Iowa · Built 2016 · 4 Lanes · 5,100 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
000000000700810
Year Built
2016
Length
11.5 m (37.7 ft)
Max Span
3.7 m
Lanes
4
Daily Traffic
5,100
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.