I 29 IA 12 NB over PERRY CREEK CONDUIT

0.1 mi S of jct US 77 · County 193, Iowa · Built 2017 · 3 Lanes · 16,450 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000700345
Year Built
2017
Reconstructed
2020
Length
27 m (88.6 ft)
Max Span
25.9 m
Width
19.7 m (64.6 ft)
Lanes
3
Daily Traffic
16,450
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.