I 80 EB TO I 29 NB over I80 & I29 INTERCHANGE

I-80 I-29 AND RAMPS · County 155, Iowa · Built 2014 · 1 Lanes · 5,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000700045
Year Built
2014
Length
605.3 m (1985.9 ft)
Max Span
59.4 m
Width
10.7 m (35.1 ft)
Lanes
1
Daily Traffic
5,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.