I 74 EB OFF RAMP over MISSISSIPPI BLVD

EB. I-74 RAMP A TO US 6 7 · County 163, Iowa · Built 2019 · 2 Lanes · 4,610 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000700040
Year Built
2019
Length
42 m (137.8 ft)
Max Span
41.1 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
4,610
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.