CORRECTIONVILLE RD over US 75
1.7 mi. N of jct. IA 12 · County 193, Iowa · Built 1998 · 2 Lanes · 1,735 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
42.496981, -96.320383
This bridge is in worse condition than 47% of bridges in County 193. The average bridge in Iowa is 0 years old; this one is 28 years old.
Nearby Bridges
US 75 SB over STONE AVE
Built 1999
US 75 NB over STONE AVE
Built 1999
CORRECTIONVILLE over BACON CREEK
Built 1900
NB IA 12 over US 20 & US 75
Built 1978
SB IA 12 over US 20
Built 1978
US 75 NB over OUTER DR
Built 2000
US 75 SB over OUTER DR
Built 2000
WB US 20 over PROPOSED RD.
Built 1978
LOCAL over STREAM
Built 1998
EB US 20 over PROPOSED RD.
Built 1978
Bridge Details
- Structure #
- 000000000606585
- Year Built
- 1998
- Length
- 92.4 m (303.1 ft)
- Max Span
- 29.3 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,735
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.