EAST WASHINGTON ST over W NODAWAY RIVER

069363205 · County 145, Iowa · Built 2018 · 2 Lanes · 2,091 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000603571
Year Built
2018
Length
127.1 m (417 ft)
Max Span
46.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
2,091
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.