STAGECOACH DR over SUGAR CREEK
City of West Des Moines · County 049, Iowa · Built 2017 · 2 Lanes · 144 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.550414, -93.844461
This bridge is in worse condition than 27.2% of bridges in County 049. The average bridge in Iowa is 0 years old; this one is 9 years old.
Nearby Bridges
BOONEVILLE RD over SUGAR CREEK
Built 2018
FM over SUGAR CREEK
Built 1986
GRAND PRAIRIE PKWY over SUGAR CREEK
Built 2016
LOCAL over SUGAR CREEK
Built 1978
GRAND AVE over SUGAR CREEK
Built 2023
BOONEVILLE RD over JOHNSON CREEK
Built 2022
GRAND PRAIRIE PKWY over I 80
Built 2010
GRAND AVE over DRAINAGE
Built 2017
GRAND AVE over JOHNSON CREEK
Built 2023
EB I-80 over SUGAR CREEK
Built 1966
Bridge Details
- Structure #
- 000000000505550
- Year Built
- 2017
- Length
- 41.1 m (134.8 ft)
- Max Span
- 41.1 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 144
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.