STAGECOACH DR over SUGAR CREEK

City of West Des Moines · County 049, Iowa · Built 2017 · 2 Lanes · 144 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000505550
Year Built
2017
Length
41.1 m (134.8 ft)
Max Span
41.1 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
144
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.