HAMILTON BLVD over PERRY CREEK

000000000 · County 193, Iowa · Built 1971 · 5 Lanes · 18,291 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000503280
Year Built
1971
Length
39.9 m (130.9 ft)
Max Span
15.2 m
Width
28.9 m (94.8 ft)
Lanes
5
Daily Traffic
18,291
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.