GUTHRIE AVE over OVER UP RR

079243600 · County 153, Iowa · Built 1978 · 4 Lanes · 5,368 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000501260
Year Built
1978
Length
219.8 m (721.1 ft)
Max Span
33.2 m
Width
21.5 m (70.5 ft)
Lanes
4
Daily Traffic
5,368
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.