2ND AVE over BIRDLAND DR

079243502 · County 153, Iowa · Built 2023 · 4 Lanes · 17,517 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
000000000501161
Year Built
2023
Length
37.9 m (124.3 ft)
Max Span
17.7 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
17,517
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.