235TH ST over MCCANDLESS-CLEGHORN

083450803 · County 133, Iowa · Built 2021 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

42.016094, -96.115369

This bridge is in worse condition than 24.4% of bridges in County 133. The average bridge in Iowa is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
000000000363116
Year Built
2021
Length
21.6 m (70.9 ft)
Max Span
8.5 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
150
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.