MALLARD AVE over DRAINAGE DITCH

098200702 · County 195, Iowa · Built 2023 · 2 Lanes · 15 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
000000000355601
Year Built
2023
Length
10.1 m (33.1 ft)
Max Span
4.9 m
Lanes
2
Daily Traffic
15
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.