FM over SMALL CREEK
087420902 · County 193, Iowa · Built 1962 · 2 Lanes · 339 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
42.3688, -95.748372
This bridge is in worse condition than 70.1% of bridges in County 193. The average bridge in Iowa is 0 years old; this one is 64 years old.
Nearby Bridges
Bridge Details
- Structure #
- 000000000351320
- Year Built
- 1962
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 339
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $264,000
- Total Project Cost
- $396,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.