SUMMIT ROAD over WALKER CREEK

070202601 · County 185, Iowa · Built 2023 · 2 Lanes · 30 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

40.841014, -93.125669

This bridge is in worse condition than 35.8% of bridges in County 185. The average bridge in Iowa is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
000000000340572
Year Built
2023
Length
19.8 m (65 ft)
Max Span
19.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
30
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.