FM over SOUTH ENGLISH RIVER

077090706 · County 183, Iowa · Built 1993 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000337921
Year Built
1993
Length
59.4 m (194.9 ft)
Max Span
19.5 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.