800TH STREET over SMALL STREAM

079373401 · County 165, Iowa · Built 2023 · 2 Lanes · 46 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 7 Good
Substructure 8 Very Good

Location

41.616367, -95.137175

This bridge is in worse condition than 15.9% of bridges in County 165. The average bridge in Iowa is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
000000000305131
Year Built
2023
Length
14.3 m (46.9 ft)
Max Span
14.3 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
46
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$90,000,000
Total Project Cost
$90,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.