FM over OVERFLOW ON BOYER RIVER

089372201 · County 161, Iowa · Built 1964 · 2 Lanes · 249 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Condition Ratings

ComponentRatingDescription
Deck 4 Poor
Superstructure 4 Poor
Substructure 4 Poor

Location

42.518203, -95.202997

This bridge is in worse condition than 71% of bridges in County 161. The average bridge in Iowa is 0 years old; this one is 62 years old.

Nearby Bridges

Bridge Details

Structure #
000000000301800
Year Built
1964
Length
23.8 m (78.1 ft)
Max Span
8.8 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
249
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$0