FM over E FORK GRAND RIVER

070292401 · County 159, Iowa · Built 2003 · 2 Lanes · 338 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000298090
Year Built
2003
Length
54.6 m (179.1 ft)
Max Span
19.8 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
338
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.