115TH ST over TRIB TO SAND CREEK

070281003 · County 159, Iowa · Built 2021 · 2 Lanes · 11 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

40.875117, -94.066231

This bridge is in worse condition than 16.3% of bridges in County 159. The average bridge in Iowa is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
000000000297721
Year Built
2021
Length
25.3 m (83 ft)
Max Span
24.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
11
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$30,000