FM over SOUTH ENGLISH RIVER
078142802 · County 157, Iowa · Built 1964 · 2 Lanes · 480 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
41.531978, -92.489156
This bridge is in worse condition than 62.1% of bridges in County 157. The average bridge in Iowa is 0 years old; this one is 62 years old.
Nearby Bridges
LOCAL over SOUTH ENGLISH RIVER
Built 1984
FM over STREAM
Built 1987
LOCAL over SO ENGLISH RIVER
Built 1980
FM over SOUTH ENGLISH RIVER
Built 2002
LOCAL over SO ENGLISH RIVER
Built 1980
FM over SOUTH ENGLISH RIVER
Built 1990
LOCAL over SOUTH ENGLISH RIVER
Built 1953
LOCAL over SMALL CREEK
Built 1985
LOCAL over SOUTH ENGLISH RIVER
Built 1974
LOCAL over MOON CREEK
Built 1952
Bridge Details
- Structure #
- 000000000291450
- Year Built
- 1964
- Length
- 23.5 m (77.1 ft)
- Max Span
- 8.8 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 480
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $671,000
- Total Project Cost
- $1,007,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.