G30 PINOAK RD over SILVER CREEK

076411201 · County 155, Iowa · Built 2014 · 2 Lanes · 219 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000288381
Year Built
2014
Length
31 m (101.7 ft)
Max Span
11.8 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
219
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.