BEECHNUT ROAD over MUD CREEK
074412401 · County 155, Iowa · Built 2023 · 2 Lanes · 26 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
41.203608, -95.510506
This bridge is in worse condition than 12.9% of bridges in County 155. The average bridge in Iowa is 0 years old; this one is 3 years old.
Nearby Bridges
FM over MUD CREEK
Built 1958
350TH ST over DRAINAGE
Built 2000
ASPEN ROAD over MUD CREEK
Built 2009
FM over MUD CREEK
Built 1976
IA 92 over STREAM
Built 1955
BEECHNUT ROAD over SILVER CREEK
Built 1997
FM over DRAINAGE
Built 1961
ASPEN ROAD over STREAM
Built 1998
IA 92 over SILVER CREEK
Built 1955
PIONEER TRAIL over SILVER CREEK
Built 1948
Bridge Details
- Structure #
- 000000000284481
- Year Built
- 2023
- Length
- 31.1 m (102 ft)
- Max Span
- 30.2 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 26
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.