IA 140 over DRAINAGE

0.5 mi. N of SR C60 · County 149, Iowa · Built 2008 · 2 Lanes · 970 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000000270516
Year Built
2008
Length
7.6 m (24.9 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
970
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.