FM over CYLINDER CREEK

094310901 · County 147, Iowa · Built 1987 · 2 Lanes · 45 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 5 Fair

Location

42.980547, -94.514586

This bridge is in worse condition than 57% of bridges in County 147. The average bridge in Iowa is 0 years old; this one is 39 years old.

Nearby Bridges

Bridge Details

Structure #
000000000268661
Year Built
1987
Length
39 m (128 ft)
Max Span
14.9 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
45
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$600,000
Total Project Cost
$700,000