REDWOOD AVE over DRY RUN

095412602 · County 141, Iowa · Built 2023 · 2 Lanes · 35 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

43.025111, -95.663433

This bridge is in worse condition than 22.4% of bridges in County 141. The average bridge in Iowa is 0 years old; this one is 3 years old.

Nearby Bridges

Bridge Details

Structure #
000000000260261
Year Built
2023
Length
28.3 m (92.8 ft)
Max Span
10.7 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
35
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$40,000
Total Project Cost
$50,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.