HOLLY AVE over GOSHEN DRAINAGE DITCH

078032002 · County 139, Iowa · Built 2023 · 2 Lanes · 25 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
000000000258291
Year Built
2023
Length
11.9 m (39 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
25
Material
Concrete Continuous
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.