T54 TIMBER AVE over BEAVER CREEK

0.2 mi N of IA 9 · County 131, Iowa · Built 2015 · 2 Lanes · 49 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
000000000248341
Year Built
2015
Length
10.3 m (33.8 ft)
Max Span
3 m
Lanes
2
Daily Traffic
49
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.