FM over CALHOUN CREEK

077201603 · County 125, Iowa · Built 1969 · 2 Lanes · 110 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000241350
Year Built
1969
Length
61 m (200.1 ft)
Max Span
23.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
110
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000,000
Total Project Cost
$1,200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.