155TH ST. over BRANCH OF MINERAL CREEK

085022205 · County 105, Iowa · Built 1941 · 2 Lanes · 11 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000208070
Year Built
1941
Reconstructed
2016
Length
12.5 m (41 ft)
Max Span
7 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
11
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$250,000
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.