V10 DALE AVE over STAFF CREEK

100142702 · County 089, Iowa · Built 2022 · 2 Lanes · 707 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000184061
Year Built
2022
Length
22.3 m (73.2 ft)
Max Span
8.5 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
707
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$20,000
Total Project Cost
$30,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.