LOC 128 TRAIL over BOYER RIVER

081411705 · County 085, Iowa · Built 1940 · 2 Lanes · 89 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
000000000179185
Year Built
1940
Reconstructed
1977
Length
49.4 m (162.1 ft)
Max Span
36.6 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
89
Material
Steel
Design
Truss - Thru
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$290,000
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.