S27 over TIPTON CREEK

087220202 · County 083, Iowa · Built 2021 · 2 Lanes · 285 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

42.380711, -93.385742

This bridge is in worse condition than 7.9% of bridges in County 083. The average bridge in Iowa is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
000000000175791
Year Built
2021
Length
33.8 m (110.9 ft)
Max Span
13.1 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
285
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.