LOCAL over MIDDLE FORK BEAVER CREEK

089173002 · County 075, Iowa · Built 1978 · 2 Lanes · 5 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000166121
Year Built
1978
Reconstructed
2016
Length
29.3 m (96.1 ft)
Max Span
5.8 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
5
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$264,000
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.